Several days prior to the demonstration project installation, the old concrete was removed, banks were graded to a stable slope, and rock rip-rap was installed at the toe of the bank. This was completed using equipment and crews from the City of Ann Arbor and Washtenaw County Road Commission.
Photo 1 of 5 Washtenaw County Road Commission gradall grades river banks back to a stable slope.
Photo 2 of 5 Road Commission gradall places rock rip-rap at toe of newly graded river bank.
Photo 3 of 5 View downstream showing rip-rap in place and silt fence installed.
|